Pilot production arrangement and its purpose

All the equipments have been installed, and after single-unit test and no-load linkage test, each equipment has been thoroughly inspected, and after confirming that there is no problem, it can enter the trial production stage of the system, and the exhaust gas treatment, raw material grinding and firing system should be synchronized as much as possible. In order to adapt the operating components of Small Scale Iron Ore Processing Equipment bearings, gears and other equipment to the needs of operation, it is necessary to carry out a no-load test. At the same time, in order to avoid failures in the commissioning test, the following places must be fully checked:

  • 1. The supply of lubricating oil for each equipment;
  • 2. There is no abnormal contact between the moving parts and the fixed parts;
  • 3. Accuracy during installation.

After all stages of the test, the bearings can be better run-in, allowing the operator to learn how to actually operate, adjust, and prepare for full-load test. The full-load trial production of the system is mainly to select better set values ​​and operating parameters according to the control of each point process parameters, to find better operating conditions and effects.

Pilot production preparation

After thoroughly reviewing all equipment in the system, the following production preparations should be carried out:

  • 1. Before adding lubricating oil to the bearing and reducer, carefully carry out internal inspection and cleaning, and then inject the lubricating oil according to the requirements of each equipment. The amount of oil should meet the requirements.
  • 2, secret inspection. In order to ensure the normal operation of the system, the amount of cold air leaking into the system must be strictly controlled, and the parts that are prone to air leakage should be inspected and sealed.
  • 3. Power transmission test of high voltage electrostatic precipitator. Conduct a power transmission test on the electric precipitator, and observe whether the voltage and current meet the requirements, and check the rapping device.
  • 4. Spray test of Small Scale Iron Ore Processing Equipment. Put all the nozzles outside, start the water pump, observe the atomization of the nozzle under different water volume and pressure conditions, whether there is leakage, measure the large amount of water and compare the small atomization amount, and open one water pump, open two The number of pumps and different nozzles are measured, the accuracy of the flowmeter is checked, and the test production is fully prepared.

Trial production essentials

The trial production of exhaust gas treatment is the key to directly affecting the entire production line.